The whole paint booth and material movement area is covered by Aluminum and glass as shown.
The flooring is coated with 5mm thickness of epoxy coating which helps in dust control.
Two flash off zone which helps more cooling time for the painted components. Top Magazine for the FG storage were more than 1500bins can be stored.
Oven: Specially installed Star Deter Sensor to avoid oven curing failures, When the heater is switched on the blower is switched on simultaneously.